Cause all that matters here is passing the Cisco 200-125 exam. Cause all that you need is a high score of 200-125 CCNA Cisco Certified Network Associate CCNA (v3.0) exam. The only one thing you need to do is downloading Pass4sure 200-125 exam study guides now. We will not let you down with our money-back guarantee.
2021 Sep 200-125 braindumps
Q191. - (Topic 7)
Refer to the exhibit.
A network administrator attempts to ping Host2 from Host1 and receives the results that are shown. What is the problem?
A. The link between Host1 and Switch1 is down.
B. TCP/IP is not functioning on Host1
C. The link between Router1 and Router2 is down.
D. The default gateway on Host1 is incorrect.
E. Interface Fa0/0 on Router1 is shutdown.
F. The link between Switch1 and Router1 is down.
Answer: C
Q192. - (Topic 3)
How many bits are contained in each field of an IPv6 address?
A. 24
B. 4
C. 8
D. 16
Answer: D
Q193. - (Topic 4)
Which characteristics are representative of a link-state routing protocol? (Choose three.)
A. provides common view of entire topology
B. exchanges routing tables with neighbors
C. calculates shortest path
D. utilizes event-triggered updates
E. utilizes frequent periodic updates
Answer: A,C,D
Q194. - (Topic 4)
What is the effect of using the service password-encryption command?
A. Only the enable password will be encrypted.
B. Only the enable secret password will be encrypted.
C. Only passwords configured after the command has been entered will be encrypted.
D. It will encrypt the secret password and remove the enable secret password from the configuration.
E. It will encrypt all current and future passwords.
Answer: E
Q195. - (Topic 8)
The output of the show frame-relay pvc command shows "PVC STATUS = INACTIVE". What does this mean?
A. The PVC is configured correctly and is operating normally, but no data packets have been detected for more than five minutes.
B. The PVC is configured correctly, is operating normally, and is no longer actively seeking the address of the remote router.
C. The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to trigger a call to the remote router.
D. The PVC is configured correctly on the local switch, but there is a problem on the remote end of the PVC.
E. The PVC is not configured on the local switch.
Answer: D

Most up-to-date 200-125 free download:
Q196. - (Topic 2)
Which IEEE standard protocol is initiated as a result of successful DTP completion in a switch over Fast Ethernet?
A. 802.3ad
B. 802.1w
C. 802.1D
D. 802.1Q
Answer: D
Q197. - (Topic 8)
Which command allows you to verify the encapsulation type (CISCO or IETF) for a Frame Relay link?
A. show frame-relay lmi
B. show frame-relay map
C. show frame-relay pvc
D. show interfaces serial
Answer: B
Q198. - (Topic 9)
What is the effect of the overload keyword in a static NAT translation configuration?
A. It enables port address translation.
B. It enables the use of a secondary pool of IP addresses when the first pool is depleted.
C. It enables the inside interface to receive traffic.
D. It enables the outside interface to forward traffic.
Answer: A
Q199. - (Topic 3)
Which command enables IPv6 forwarding on a Cisco router?
A. ipv6 local
B. ipv6 host
C. ipv6 unicast-routing
D. ipv6 neighbor
Answer: C
Q200. - (Topic 4)
A Cisco router is booting and has just completed the POST process. It is now ready to find and load an IOS image. What function does the router perform next?
A. It checks the configuration register.
B. It attempts to boot from a TFTP server.
C. It loads the first image file in flash memory.
D. It inspects the configuration file in NVRAM for boot instructions.
Answer: A