Exam Code: 3V0-624 (Practice Exam Latest Test Questions VCE PDF)
Exam Name: VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam
Certification Provider: VMware
Free Today! Guaranteed Training- Pass 3V0-624 Exam.
P.S. Guaranteed 3V0-624 keys are available on Google Drive, GET MORE: https://drive.google.com/open?id=1eINzd6M2vOHYKJToFohMz1RDsHdhNblV
New VMware 3V0-624 Exam Dumps Collection (Question 1 - Question 10)
Q1. When implementing update policies for the vSphere environment, which would be the VMware-recommended way to update the vCenter Server Appliance (VCSA) when an underlying operating system (OS) patch is released?
A. Introduce a policy that requires a system administrator to check if a new appliance update (which might include an OS update) is available from the downloads section of MyVMware portal, and follow the VCSA documentation to apply the update.
B. Do nothing - the VCSA applies all OS updates automatically without any human interaction.
C. Introduce a policy that requires a system administrator to go online and check with the OS vendor to see if a new version is available. If it is, download it manually, log in to the VCSA with the root credentials, and proceed with the OS update.
D. Configure VMware Update Manager to download the OS update and apply it on a scheduled basis.
Answer: D
Q2. A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
u2022 application must be restarted quickly in the event of a total site failure
u2022 allow for planned migration during maintenance
u2022 applications must be kept online even when migrated due to planned maintenance
Answer:
Q3. A customer is using a vSphere APIs for Storage Awareness (VASA) compatible storage array. The VASA provider is published as a virtual appliance.
To ensure recoverability, where must the VASA prowler and vCenter server virtual machines be stored?
A. The VASA provider and vCenter Server will be placed on the standard datastore (VMFS, NFS).
B. The VASA provider and vCenter Server will be placed on the vVol datastore.
C. The vCenter Server will be placed on the vVol datastore and the VASA provider will be placed on the standard datastore (VMFS, NFS).
D. The VASA provider will be placed on the vVol datastore and the vCenter Server will be placed on the standard datastore (VMFS, NFS)
Answer: A
Q4. A company is implementing a new ESXi host cluster at its New York data center.
u2022 The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.
u2022 Six ESXi hosts have been approved for this workload.
u2022 The ESXi hosts are to be purchased from Dell with these specifications:
u2022 2x10 core 2.2GHz Intel CPU
u2022 128 GB of memory
u2022 The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.
u2022 All virtual machines should be protected by vSphere High Availability Which are two true statements regarding failover capacity? (Choose two.)
A. vSphete HA can be configured to reserve 25% of memory capacity for failover.
B. vSphete HA can be configured to specify two dedicated failover hosts.
C. vSphere HA can be configured to reserve 35% of memory capacity for failover.
D. vSphere HA can be configured to specify one dedicated failover host.
Answer: CD
Q5. A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
u2022 The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
u2022 The new severs have a 90-day delivery time.
u2022 A data center for disaster recovery has been selected, and it is 20 miles way and connected by MPLS.
u2022 The security team will continue to utilize its current investments and VM Encryption for the new environment.
u2022 The backup team currently uses Data Domain, and reports show an 8.1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)
A. MPLS will be used to connect the two data centers.
B. There is 180 days left of current capacity.
C. Data Domain will get an 8:1 compression and deduplication ratio with the new workloads.
D. A disaster will NOT affect both data centers.
Answer: BD
Q6. A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
u2022 application must be restarted quickly in the event of a total site failure
u2022 allow for planned migration during maintenance
u2022 applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept
Answer:
Q7. A company has one data center site running 50 hosts and 400 virtual machines and requires a vSphere 6.x design.
1. The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.
2. The application developer is concerned about anticipated growth as several new projects begin.
3. The CISO is worried about data leaks and theft.
4. The CTO would like to buy new servers with better specifications and higher consolidation ratio.
Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.
Answer:
Q8. A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution.
Which three storage policies should be used? (Choose three.)
A. RAID5/6 for data disk and RAID1 for OS disk with FTT=2.
B. IOPS limit and checksum should be enabled.
C. RAID5/6 for OS disk and RAID1 for data disk with FTT=2.
D. Configure multiple disk stripes.
E. Deduplication and Compression should be disabled.
Answer: BCD
Q9. A developer is tasked with building an application to process shipping requests. The developer is consulting the vSphere team to determine failover options and performance best practices.
u2022 The development team is providing three physical ESXi hosts with 8 CPU cores and 256G8 of RAM per host.
u2022 The developer does NOT know how many virtual machines they will require.
Which virtual machine (VM) sizing strategy will provide the highest level of uptime, individual VM performance, and failover capacity?
A. A few large 8 vCPU VMs per host protected by vSphere HA.
B. Many small 1 vCPU VMs participating in an OS level clustered application protected by vSphere HA.
C. A few large 8 vCPU VMs per host protected by vSphere Fault Tolerance.
D. Many small l vCPU VMs participating in an OS level clustered application protected by vSphere Fault Tolerance.
Answer: D
Q10. Match the business statement to its appropriate concept.
Answer:
100% Most up-to-date VMware 3V0-624 Questions & Answers shared by 2passeasy, Get HERE: https://www.2passeasy.com/dumps/3V0-624/ (New Q&As)