Passleader C2010-555 Questions are updated and all C2010-555 answers are verified by experts. Once you have completely prepared with our C2010-555 exam prep kits you will be ready for the real C2010-555 exam without a problem. We have Far out IBM C2010-555 dumps study guide. PASSED C2010-555 First attempt! Here What I Did.

IBM C2010-555 Free Dumps Questions Online, Read and Test Now.

NEW QUESTION 1
An asset requires maintenance on a monthly, quarterly and annual basis. Three job plans have been created to meet this requirement called MONTHLY, QUARTERLY and ANNUAL. What is the correct job plan sequence that needs to be used?

  • A. MONTHLY=1, QUARTERLY=4, ANNUAL=1
  • B. MONTHLY=12, QUARTERLY=4, ANNUAL=1
  • C. MONTHLY=3, QUARTERLY=4, ANNUAL=12
  • D. MONTHLY=1, QUARTERLY=3, ANNUAL=12

Answer: A

NEW QUESTION 2
If the status of an item record is modified in the Item Master application, which two other records need to be updated in order for the item to be purchase and stocked? (Choose two.)

  • A. the item’s Company status
  • B. the item’s Organizational status
  • C. the status of the item for the Set
  • D. the status of the item for the Site
  • E. the status of the item in inventory

Answer: CE

NEW QUESTION 3
Which application must be used to create services that can be selected from a value list on a purchase order?

  • A. Service Items
  • B. Service Records
  • C. Common Services
  • D. Standard Services

Answer: A

NEW QUESTION 4
An administrator is setting up security to enforce site specific restrictions. What type of security group does the administrator need to create?

  • A. Maxadmin
  • B. Independent
  • C. Administrator
  • D. Allow restrictions

Answer: A

NEW QUESTION 5
A company has a requirement to identify and characterize similar assets. In which application can this be done?

  • A. Sets
  • B. Actions
  • C. Domains
  • D. Classifications

Answer: D

NEW QUESTION 6
A workflow process has been revised and the new revision made active.
What happens to records that had already been routed into that workflow process before this was done?

  • A. They continue running in the earlier revision.
  • B. They are removed from workflow and must be restarted manually.
  • C. They switch to running in the new revision as that is the only active revision.
  • D. They are removed from workflow and are started in the new revision by a cron task.

Answer: D

NEW QUESTION 7
A planner needs to combine a number of items to be used regularly that can be tracked by a single item number and issued to work orders.
How can this be achieved?

  • A. Using an item assembly structure.
  • B. Transferring the necessary items to a single bin.
  • C. Changing the item number of each included item.
  • D. Updating the physical count of the inventory record.

Answer: B

NEW QUESTION 8
Maintenance is required on an asset at every 6,000 miles that uses job plan JP6K, and there is an additional Job Plan, JP18K, that is used at every 18,000 miles. This Meter-Based Frequency PM has a frequency of 6,000 miles.
What are the correct sequence values to use on the Job Plan Sequence tab?

  • A. JP6K = 1JP18K = 2
  • B. JP6K = 1JP18K = 3
  • C. JP6K = 0JP18K = 3
  • D. JP6K = 6JP18K = 18

Answer: B

NEW QUESTION 9
A company has a requirement to have items in the storerooms to be reordered automatically. How can this be achieved?

  • A. Reorder Escalation
  • B. Reorder Cron Task
  • C. Reorder – Reorder Items
  • D. Reorder Direct Issue Items/Services

Answer: C

NEW QUESTION 10
A storeroom clerk is processing items to be shipped to various locations. In the Inventory Usage application, while processing one of these items, the Split Usage Quantity dialog is displayed and the clerk selects the Auto-Split option.
What is validated?

  • A. A rotating item is requested and the quantity is more than one.
  • B. The inventory balance for the item is greater than the ordered quantity.
  • C. A lotted item with the same quantity has been selected on another usage line.
  • D. The quantity in a storage bin already meets the required quantity on the Inventory Usage line.

Answer: C

NEW QUESTION 11
The job plan coordinator needs to add new tasks to an existing job plan which is currently revision 2. The coordinator selects Revise Job Plan from the More Actions menu and now has a new job plan version, revision 3. What is the status of revision 2?

  • A. ACTIVE
  • B. PNDREV
  • C. REVISED
  • D. INACTIVE

Answer: C

NEW QUESTION 12
The buyer for a vendor received an offer to acquire a specific item and if a certain quantity is ordered, a specific cost for that item will be given. Which purchase contract type needs to be created?

  • A. Price
  • B. Master
  • C. Blanket
  • D. Purchase

Answer: D

NEW QUESTION 13
What is the reason to specify asset relationships?

  • A. To deploy assets.
  • B. To design the asset infrastructure.
  • C. To define a logical connection between separate assets.
  • D. To define how assets are allowed to behave when work is performed on them.

Answer: C

NEW QUESTION 14
A company needs to add the unit of measures for items, tool and services. In which application can this be done?

  • A. Receiving
  • B. Storerooms
  • C. Asset Templates
  • D. Request for Quotations

Answer: A

NEW QUESTION 15
A company wishes to track items previously used for maintenance work on assets so they can easily be identified in the future.
How can this be accomplished?

  • A. Non-Rotating Assets can be listed on the Spare Parts tab on the asset record.
  • B. Rotating items can be recorded on the Subassembly table on the asset record.
  • C. Non-Rotating items can be recorded on the Spare Parts tab on the asset record.
  • D. Consumable items can be recorded in the Spare Parts application against the asset record.

Answer: D

NEW QUESTION 16
......

100% Valid and Newest Version C2010-555 Questions & Answers shared by Dumps-files.com, Get Full Dumps HERE: https://www.dumps-files.com/files/C2010-555/ (New 144 Q&As)