It is more faster and easier to pass the GAQM CLSSGB exam by using Approved GAQM Certified Lean Six Sigma Green Belt (CLSSGB) questuins and answers. Immediate access to the Most up-to-date CLSSGB Exam and find the same core area CLSSGB questions with professionally verified answers, then PASS your exam with a high score now.

GAQM CLSSGB Free Dumps Questions Online, Read and Test Now.

NEW QUESTION 1
What is the Cycle Time, in minutes, for a process having a Throughput of 360 units per hour?

  • A. 0.167
  • B. 0.333
  • C. 0.667
  • D. 1.333

Answer: A

NEW QUESTION 2
The deviation of the measured value from the actual value regardless of the operator is known as __________.

  • A. Linearity
  • B. Bias
  • C. Repeatability
  • D. Movement

Answer: B

NEW QUESTION 3
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

  • A. True
  • B. False

Answer: A

NEW QUESTION 4
A Belt gathered the following defect data for a shoe production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting38 Forming17 Stitching56 Sealing42

  • A. Forming, Sealing, Cutting, Stitching
  • B. Sealing, Stitching, Forming, Cutting
  • C. Stitching, Sealing, Cutting, Forming
  • D. Forming, Cutting, Sealing, Stitching

Answer: C

NEW QUESTION 5
The X-Y Diagram is a tool used to identify/collate potential X's and assess their relative impact on multiple Y's.

  • A. True
  • B. False

Answer: A

NEW QUESTION 6
Lean Six Sigma’s general approach to solving significant challenges related to a process is called __________.

  • A. DOE
  • B. SIPOC
  • C. DMAIC
  • D. FMEA

Answer: C

NEW QUESTION 7
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.

  • A. True
  • B. False

Answer: B

NEW QUESTION 8
Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.

  • A. Standard Deviation
  • B. Mean
  • C. Median
  • D. True value

Answer: D

NEW QUESTION 9
One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.

  • A. Deferred planned usage
  • B. Defects per unit
  • C. Decreased production utilization
  • D. Downtime per unit

Answer: B

NEW QUESTION 10
Contingency Tables are used to perform which of these functions?

  • A. Illustrate one-tail proportions
  • B. Analyze the "what if" scenario
  • C. Contrast the Outliers under the tail
  • D. Compare more than two sample proportions with each other

Answer: D

NEW QUESTION 11
Fractional Factorial designs for an experimental approach are used when __________ about the multiple metric interaction in a process.

  • A. Much is known
  • B. Little is known
  • C. We don’t care
  • D. Data exists

Answer: B

NEW QUESTION 12
A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a __________ result.

  • A. Revenue total
  • B. Month end
  • C. Customer desired
  • D. Budgeted

Answer: C

NEW QUESTION 13
Which element of waste best describes "the cost of an idle resource"?

  • A. Waiting
  • B. Motion
  • C. Inventory
  • D. Correction

Answer: A

NEW QUESTION 14
Which element of waste best describes "the unnecessary movement of materials and/or goods"?

  • A. Overprocessing
  • B. Motion
  • C. Conveyance
  • D. Correction

Answer: C

NEW QUESTION 15
Long-term Data represents all the variation that one can expect within the subject process.

  • A. True
  • B. False

Answer: A