we provide Highest Quality Hitachi HH0-210 practice test which are the best for clearing HH0-210 test, and to get certified by Hitachi HDS Certified Implementer - Enterprise. The HH0-210 Questions & Answers covers all the knowledge points of the real HH0-210 exam. Crack your Hitachi HH0-210 Exam with latest dumps, guaranteed!

Q18. You are installing Hitachi Global Link Manager (HGLM) in an environment where port 162 is in use by another application. The network administrator has instructed you to configure HGLM to use port 182 for SNMP instead. Which file is used to configure this port? 

A. server.properties 

B. account.settings 

C. hglm.port.config 

D. host.properties 

Answer: A


Q19. A VSP receives a pinned track error with a "write error" description on the SVP. How would you resolve the problem? 

A. Replace the SVP. 

B. Replace the PDEV. 

C. Replace the DKA. 

D. Restore the customer data. 

Answer: B


Q20. A customer wants to add a second DKC to a VSP. Which three hardware features must be installed in the second DKC? (Choose three.) 

A. Hub 

B. VSD 

C. CMA 

D. ESW 

E. DKA 

Answer: ABD


Q21. During the installation of a VSP, a Hitachi Unified Storage (HUS) system and a third-party array are connected as external storage. Discovering LUNs on the HUS is successful, however the attempt to discover LUNs on the third-party array fails. What are two reasons for this to happen? (Choose two.) 

A. The Universal Volume Manager Multipath Option has not been set. 

B. Third-party arrays are not supported by Universal Volume Manager. 

C. Port security is preventing access to the LUNs on the third-party array. 

D. The VSP microcode does not support this particular third-party array. 

Answer: CD


Q22. A storage administrator must provision storage to Windows and Solaris hosts using the same ports. Which action should be performed? 

A. Register Windows and Solaris hosts into the same Host Group. 

B. Enter host names so WWNs will be automatically populated. 

C. Register Windows and Solaris hosts into different Host Groups. 

D. Set a LU path for hosts that are not registered in Host Groups. 

Answer: C


Q23. Which VSP component owns an LDEV? 

A. Front-end Director 

B. Virtual Storage Director 

C. Back-end Director 

D. Cache 

Answer: B


Q24. A customer has removed the Data Retention license key from a VSP. What must be done so the customer can make use of the Data Retention functionality again? 

A. Re-install the same license key again. 

B. Order a new license key and install it. 

C. Re-enable the license key. 

D. Enter the Available Mode and re-activate the license key. 

Answer: B


Q25. What must be installed on an AIX server prior to a Hitachi Dynamic Link Manager (HDLM) installation? 

A. MPXIO 

B. HACMP 

C. Hitachi ODM 

D. Hitachi Tuning Manager agent 

Answer: C


Q26. Which two statements regarding how users login to Storage Navigator 2 on a VSP are correct? (Choose two.) 

A. A user name can only be used by one user at a time. 

B. Multiple users can login using a different user name each. 

C. Multiple users can login using the same user name. 

D. A maximum of 4 users can login at the same time. 

Answer: AB


Q27. What are two ways to ensure secure access to storage through a fabric? (Choose two.) 

A. Use SNMP. 

B. Use zoning. 

C. Use Host Group security. 

D. Use port security on the switch(es). 

Answer: BC


Q28. Which document is designed to assist those involved in the sale, installation and support of Hitachi Enterprise storage systems to ensure proper installation planning? 

A. the HiFire Pre-installation Report 

B. the System Administration Guide 

C. the HiPlan Service Guide 

D. the System Assurance Document 

Answer: D


Q29. What are three functions of the SSVP on a VSP? (Choose three.) 

A. control of the DKC fans 

B. monitoring of the environment 

C. update of the SSW microcode 

D. control of the cache boards battery charge 

E. control of the power sequence of the entire system 

Answer: ABE


Q30. Which two statements describe what will happen when a CHA board is replaced on a VSP? (Choose two.) 

A. WWN will change with the new board. 

B. Zoning must be changed if WWN zoning is used. 

C. WWN will remain the same with the new board. 

D. Zoning does not need to be changed if WWN zoning is used. 

Answer: CD


Q31. Hitachi Dynamic Link Manager (HDLM) has been configured on a Solaris 10 server with 10 LUNs across two paths. You want to verify the number of LUNs and the path assignments. Which command would you use? 

A. dlnkmgr check -path 

B. dlnkmgr view -path -c 

C. dlnkmgr disp -lun -path 

D. dlnkmgr show -stinfo -t 

Answer: B


Q32. Which step must be performed when preparing for Hitachi Dynamic Provisioning operations? 

A. Create Pool Vol LDEVs. 

B. Map Pool Vol LDEVs to FED ports. 

C. Cross-link the mapping tables. 

D. Create a CLPR for pool LDEVs. 

Answer: A


Q33. When is a microcode exchange process complete on a VSP? 

A. After the SVP has rebooted. 

B. When all I/Os resume across all the mapped storage paths. 

C. When the 'Ready' LED turns green. 

D. When the message ormal End?is displayed.When the message ?ormal End?is displayed. 

Answer: D


Q34. After opening a case with the Hitachi Data Systems technical support center, you have been asked to collect error information. How do you send the collected data to the technical support center? 

A. Upload to ftp://ftp.hds.com. 

B. Upload to https://tuf.hds.com. 

C. Upload to http://www.hds.com. 

D. Send an email to techsup@hds.com. 

Answer: B