Proper study guides for Up to the immediate present IFPUG Certified Function Point Specialist certified begins with IFPUG I40-420 preparation products which designed to deliver the Verified I40-420 questions by making you pass the I40-420 test at your first time. Try the free I40-420 demo right now.

2021 Sep I40-420 free practice test

Q121. The two types of subgroups of an ILF are: 

A. optional and required 

B. optional and mandatory 

C. discretionary and mandatory 

D. discretionary and required 

Answer: B  


Q122. An application FP count is defined as: 

A. a measure of the current functions the application provides the user 

B. the initial development project FP count 

C. an enhancement project that alters the applications functions 

D. the activity of applying this International Standard to measure the functional size of an application 

Answer: D  


Q123. The data retrieved from the state drop down list is obtained by reading the State file that contains only state code and state description. The State file is not updated frequently as states are not added on a frequent basis. How would the drop down list be measured? 

A. 1 EQ with 1 FTR 

B. 1 EO with 1FTR 

C. 1 EQ with OFTR 

D. Not counted 

Answer: D  

114. Which of the following rules apply when counting DETs for both EOs and EQs? 

A. Count one DET for each unique user recognizable, non-repeated attribute that crosses the boundary 

B. Count one DET for each literal such as report titles or screen identifiers 

C. Count one DET for each attribute generated within the boundary and saved to an ILF without exiting the boundary 

D. Count one DET for each navigation aid used to navigate within a list 

Answer: A  


Q124. Which may be counted as ILFs? 

A. Help messages maintained by the user 

B. Temporary sort files 

C. Output reports saved to a file 

D. A and C 

Answer: D  


Q125. Which of the following types of processing logic is (are) mandatory for an elementary process to be classified as an EQ? 

A. At least one ILF or EIF is referenced 

B. Information is prepared and then presented outside the boundary 

C. Data or control information is retrieved 

D. All of the above 

Answer: D  


I40-420 exams

Renew I40-420 test:

Q126. The functional complexity of an EO is based upon which of the following? 

A. The number of RETs 

B. The number of FTRs 

C. The number of DETs 

D. Both B and C 

Answer: D  


Q127. Which GSC describes the degree to which the application communicates directly with the processor? 

A. Data communications 

B. Distributed data processing 

C. Transaction rate 

D. Online update 

Answer: A  


Q128. Which term used in FP calculations reflects the size of the functions being changed by the enhancement project - as they are / will be after implementation? 

A. CHGA 

B. CHGB 

C. DEL 

D. VAF 

Answer: A  


Q129. Which of the following statements regarding EIF counting is true? 

A. If an EIF is used in multiple processes, count the EIF as many times as the number of processes 

B. Every physical file referenced by an application is to be counted as an EIF for the application 

C. If a group of data was not counted as an ILF, then it should be counted as an EIF 

D. None of the above 

Answer: D  


Q130. Which of the following statements is true? 

A. The development project functional size is a measure of baseline functionality only 

B. The development project functional size is a measure of installed functionality 

C. The enhancement project functional size is a measure of baseline functionality 

D. The application functional size is a measure of the functionality that an application provides to the user 

Answer: D