Q1. - (Topic 10)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing schemes, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
On which device is the fault condition located?
A. R1
B. R2
C. R3
D. R4
E. DSW1
F. DSW2
G. ASW1
Answer: A
Explanation:
On R1 we need to add the client IP address for reachability to server to the access list that is used to specify which hosts get NATed.
Q2. - (Topic 5)
Scenario:
A customer network engineer has edited their OSPF network configuration and now your customer is experiencing network issues. They have contacted you to resolve the issues and return the network to full functionality.
The OSPF neighbour relationship has been lost between R1 and R3. What is causing this problem?
A. The serial interface in R1 should be taken out of the shutdown state.
B. A neighbor statement needs to be configured in R1 and R3 pointing at each other.
C. The R1 network type should be changed to point-to-multipoint non-broadcast.
D. The hello, dead and wait timers on R1 need to be reconfigured to match the values on R3.
Answer: C
Explanation:
In order for two OSPF routers to become neighbors, they must have matching network types across the links. In this case, we see that R1 has been configured as non-broadcast and R3 is using point to point non-broadcast.
This can be seen by issuing the "show running-config" command on each router, or the "show ip ospf interface" command:
Topic 6, Ticket 1: Switch Port Trunk
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running
over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Client is unable to ping IP 209.65.200.241
Solution
Steps need to follow as below:-
. When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4
Ipconfig ----- Client will be getting 169.X.X.X
. On ASW1 port Fa1/0/ 1 & Fa1/0/2 access port VLAN 10 was assigned which is using IP address 10.2.1.0/24
Sh run ------- & check for running config of int fa1/0/1 & fa1/0/2
====================================================
interface FastEthernet1/0/1switchport mode accessswitchport access vlan 10interface
FastEthernet1/0/2switchport mode accessswitchport access vlan 10
====================================================
. We need to check on ASW 1 trunk port the trunk Po13 & Po23 were receiving VLAN 20 & 200 but not VLAN 10 so that switch could not get DHCP IP address and was failing to reach IP address of Internet
. Change required: On ASW1 below change is required for switch-to-switch Connectivity..
int range portchannel13,portchannel23 switchport trunk allowed vlan none switchport trunk allowed vlan 10,200
Q3. - (Topic 14)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
What is the solution to the fault condition?
A. Disable auto summary on the EIGRP process
B. Enable EIGRP on the FastEthernet0/0 and FastEthernet0/1 interface using the no passive-interface command.
C. Change the AS number on the EIGRP routing process from 1 to 10 to much the AS number used on DSW1 and DSW2.
D. Under the EIGRP process, delete the network 10.1.4.0 0.0.0.255 command and enter the network 10.1.4.4 0.0.0.252 and 10.1.4.8 0.0.0.252 commands.
Answer: C
Explanation:
On R4, IPV4 EIGRP Routing, need to change the EIGRP AS number from 1 to 10 since DSW1 & DSW2 is configured to be in EIGRP AS number 10.
Q4. - (Topic 16)
The implementations group has been using the test bed to do a ‘proof-of-concept'. After several changes to the network addressing, routing schemes, a trouble ticket has been opened indicating that the loopback address on R1 (2026::111:1) is not able to ping the loopback address on DSW2(2026::102:1).
Use the supported commands to isolated the cause of this fault and answer the following questions.
On which device is the fault condition located?
A. R1
B. R2
C. R3
D. R4
E. DSW1
F. DSW2
G. ASW1
H. ASW2
Answer: B
Explanation:
R2 is missing the needed IPV6 OSPF for interface s0/0/0.23
Topic 17, Ticket 12 : HSRP Issue
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the
devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Solution
Steps need to follow as below:-
. Since the problem is raised that DSW1 will not become active router for HSRP group 10
. we will check for the HSRP configuration…
. From snapshot we see that the track command given needs to be changed under active VLAN10 router
. Change Required: On DSW1, related to HSRP, under vlan 10 change the given track 1 command to instead use the track 10 command.
Q5. - (Topic 7)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
What is the solution to the fault condition?
A. In Configuration mode, using the interface range Fastethernet 1/0/1 – 2, then switchport mode access vlan 10 command.
B. In Configuration mode, using the interface range Fastethernet 1/0/1 – 2, then switchport access mode vlan 10 command.
C. In Configuration mode, using the interface range Fastethernet 1/0/1 – 2, then switchport vlan 10 access command.
D. In Configuration mode, using the interface range Fastethernet 1/0/1 – 2, then switchport access vlan 10 command.
Answer: D
Explanation:
The problem here is that VLAN 10 is not configured on the proper interfaces on switch ASW1.
Q6. - (Topic 4)
Scenario:
You have been asked by your customer to help resolve issues in their routed network. Their network engineer has deployed HSRP. On closer inspection HSRP doesn't appear to be operating properly and it appears there are other network problems as well. You are to provide solutions to all the network problems.
The following debug messages are noticed for HSRP group 2. But still neither R1 nor R2 has identified one of them as standby router. Identify the reason causing the issue.
Note: only show commands can be used to troubleshoot the ticket.
R1#
'Mar 26 11:17:39.234: HSRP: Et1/0 Grp 2 Hello out 172.16.20.2 Active pri 100 vIP
172.16.20.254
'Mar 26 11:17:40.034: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active prj 130 vIP
172.16.10.254
R1#
'Mar 26 11:17:40.364: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
R1#
'Mar 26 11:17:41.969: HSRP: Et1/0 Grp 2 Hello out 172.16.20.2 Active pri 100 vIP 172.16.20.254
'Mar 26 11:17:42.719: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active prj 130 vIP
172.16.10.254
'Mar 26 11:17:42.918: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
R1#
'Mar 26 11:17:44.869: HSRP: Et1/0 Grp 2 Hello out 172.16.20.2 Active pri 100 vIP
172.16.20.254
'Mar 26 11:17:45.485: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active prj 130 vIP
172.16.10.254
'Mar 26 11:17:45.718: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
R1#
'Mar 26 11:17:47.439: HSRP: Et1/0 Grp 2 Hello out 172.16.20.2 Active pri 100 vIP
172.16.20.254
'Mar 26 11:17:48.252: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
'Mar 26 11:17:48.322: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active prj 130 vIP
172.16.10.254
R1#
'Mar 26 11:17:50.389: HSRP: Et1/0 Grp 2 Hello out 172.16.20.2 Active pri 100 vIP
172.16.20.254
'Mar 26 11:17:50.735: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
'Mar 26 11:17:50.921: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active prj 130 vIP
172.16.10.254
R1#
'Mar 26 11:17:53.089: HSRP: Et1/0 Grp2 Hello out 172.16.20.2 Active pri 100 vIP
172.16.20.254
'Mar 26 11:17:53.338: HSRP: EtO/0 Grp 1 Hello out 172.16.10.2 Active pri130vlP
172.16.10.254
'Mar 26 11:17:53.633: HSRP: EtO/0 Grp 1 Hello in 172.16.10.1 Standby pri 100 vIP
172.16.10.254
A. HSRP group priority misconfiguration
B. There is an HSRP authentication misconfiguration
C. There is an HSRP group number mismatch
D. This is not an HSRP issue: this is DHCP issue.
E. The ACL applied to interface is blocking HSRP hello packet exchange
Answer: E
Explanation:
On R1 we see that access list 102 has been applied to the Ethernet 1/0 interface:
This access list is blocking all traffic to the 224.0.0.102 IP address, which is the multicast address used by HSRP.
Topic 5, Troubleshooting OSPF
17. - (Topic 5)
Scenario:
A customer network engineer has edited their OSPF network configuration and now your customer is experiencing network issues. They have contacted you to resolve the issues and return the network to full functionality.
Connectivity from R3 to R4, R5 and R6 has been lost. How should connectivity be reestablished?
A. Configure R4 with a virtual link to 192.168.13.2
B. Change the R3 and R4 hello-interval and retransmit-interface timers to zero so the link won't go down.
C. Add an OSPF network statement for 4.4.4.4 0.0.0.0 area 1 in R3
D. Add an OSPF network statement for 192.168.34.3 0.0.0.255 area 2 in R3
E. Add an OSPF network statement for 192.168.34.0 0.0.0.255 area 1 in R3
Answer: E
Explanation:
Based on the network diagram, we know that a virtual link will need to be configured to logically connect area 2 to the back area 0. However, this is not the problem as we can see that R3 has been correctly configured to do this. It is, however, missing the network statement for the link to R4. Here, we see that the link to R4 is using the 192.168.34.0 network, but that this network has not been added to OSPF
Based on the network diagram, this link should be added to Area 1, not Area 2.
Q7. - (Topic 17)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing schemes, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened DSW1 will not become the active router for HSRP group 10.
Use the supported commands to isolated the cause of this fault and answer the following questions.
On which device is the fault condition located?
A. R1
B. R2
C. R3
D. R4
E. DSW1
F. DSW2
G. ASW1
H. ASW2
Answer: E
Explanation:
DSW references the wrong track ID number.
Topic 18, Ticket 13 : DHCP Issue
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Solution
Steps need to follow as below:-
. When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4
ipconfig ----- Client will be receiving Private IP address 169.254.X.X
. From ASW1 we can ping 10.2.1.254….
. On ASW1 VLAN10 is allowed in trunk & access command will is enabled on interface but DHCP IP address is not recd.
On R4 the DHCP IP address is not allowed for network 10.2.1.0/24 which clearly shows the problem lies on R4 & the problem is with DHCP
Q8. - (Topic 10)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services,
NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
What is the solution to the fault condition?
A. Under the interface Serial0/0/0 configuration enter the ip nat inside command.
B. Under the interface Serial0/0/0 configuration enter the ip nat outside command.
C. Under the ip access-list standard nat_trafic configuration enter the permit 10.2.0.0
0.0.255.255 command.
D. Under the ip access-list standard nat_trafic configuration enter the permit 209.65.200.0
0.0.0.255 command.
Answer: C
Explanation:
On R1 we need to add the client IP address for reachability to server to the access list that is used to specify which hosts get NATed.
Q9. - (Topic 6)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, and FHRP services, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
The fault condition is related to which technology?
A. NTP
B. Switch-to-Switch Connectivity
C. Access Vlans
D. Port Security
E. VLAN ACL / Port ACL
F. Switch Virtual Interface
Answer: B
Explanation:
Since the Clients are getting an APIPA we know that DHCP is not working. However, upon closer examination of the ASW1 configuration we can see that the problem is not with DHCP, but the fact that the trunks on the port channels are only allowing VLANs 1-9, when the clients belong to VLAN 10. VLAN 10 is not traversing the trunk on ASW1, so the problem is with switch to switch connectivity, specifically the trunk configuration on ASW1.
Topic 7, Ticket 2 : ACCESS VLAN
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Client is unable to ping IP 209.65.200.241
Solution
Steps need to follow as below:-
. When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4
Ipconfig ----- Client will be getting 169.X.X.X
. On ASW1 port Fa1/0/ 1 & Fa1/0/2 access port VLAN 10 was assigned which is using IP address 10.2.1.0/24
Sh run ------- & check for running config of int fa1/0/1 & fa1/0/2
====================================================
====================================================
. Here we are not able to see access Vlan10 configured for Port Fa1/0/1 & Fa1/0/2
. Change required: On ASW1, for configuring Access Vlan under interface fa1/0/1 & 1/0/2 we have to enable command switchport access vlan 10
Q10. - (Topic 15)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
The fault condition is related to which technology?
A. NTP
B. IP DHCP Helper
C. IPv4 EIGRP Routing
D. IPv6 RIP Routing
E. IPv4 layer 3 security
F. Switch-to-Switch Connectivity
G. Loop Prevention
H. Access Vlans
I. Port Security
J. VLAN ACL / Port ACL
K. Switch Virtual Interface
Answer: J
Explanation:
On DSW1, VALN ACL, Need to delete the VLAN access-map test1 whose action is to drop access-list 10; specifically 10.2.1.3